BIM/VDC Package Delivery Checklist
Who it's for: VDC managers, BIM leads, and coordination leads.
When to use: Use before sending RVT/IFC/NWD packages, bid sets, owner handoffs, or scan-to-BIM datasets ahead of a coordination meeting.
TeraAirlift
Delivery checklist
BIM/VDC Package Delivery Checklist
Who it's for: VDC managers, BIM leads, and coordination leads.
When to use: Use before sending RVT/IFC/NWD packages, bid sets, owner handoffs, or scan-to-BIM datasets ahead of a coordination meeting.
01Package & version
- ☐Confirm model version / federated set name in the folder
- ☐Include issue/date stamp matching the meeting agenda
- ☐Strip stale WIP that should not go to subcontractors
- ☐Note package size and expected download time for attendees
02Meeting-driven queue
- ☐Set the hard deadline relative to the coordination meeting
- ☐Queue critical packages first; archive sets second
- ☐Assign someone to confirm recipient download before the call
- ☐Prepare a contingency if bandwidth is constrained overnight
03Failure / retry plan
- ☐If transfer slips past the meeting buffer, notify attendees early
- ☐Do not mix an outdated model into a new uncontrolled share
- ☐Escalate when shipping drives would miss the meeting entirely
- ☐Capture root cause (version confusion vs bandwidth vs access)
04Recipient / access plan
- ☐Grant subcontractor access only for the packages they need
- ☐Expire access after the review window
- ☐Keep owner vs trade packages on separate controlled deliveries when needed
- ☐Record who received the package and when
05Verification plan
- ☐Confirm the recipient can open the model/viewer package
- ☐Verify version string matches the meeting agenda
- ☐Log delivery time relative to the meeting start
- ☐Archive the send record for RFI / change disputes later