BIM/VDC Package Delivery Checklist

Who it's for: VDC managers, BIM leads, and coordination leads.

When to use: Use before sending RVT/IFC/NWD packages, bid sets, owner handoffs, or scan-to-BIM datasets ahead of a coordination meeting.

Package & version

  • Confirm model version / federated set name in the folder
  • Include issue/date stamp matching the meeting agenda
  • Strip stale WIP that should not go to subcontractors
  • Note package size and expected download time for attendees

Meeting-driven queue

  • Set the hard deadline relative to the coordination meeting
  • Queue critical packages first; archive sets second
  • Assign someone to confirm recipient download before the call
  • Prepare a contingency if bandwidth is constrained overnight

Failure / retry plan

  • If transfer slips past the meeting buffer, notify attendees early
  • Do not mix an outdated model into a new uncontrolled share
  • Escalate when shipping drives would miss the meeting entirely
  • Capture root cause (version confusion vs bandwidth vs access)

Recipient / access plan

  • Grant subcontractor access only for the packages they need
  • Expire access after the review window
  • Keep owner vs trade packages on separate controlled deliveries when needed
  • Record who received the package and when

Verification plan

  • Confirm the recipient can open the model/viewer package
  • Verify version string matches the meeting agenda
  • Log delivery time relative to the meeting start
  • Archive the send record for RFI / change disputes later