BIM models exceed every attachment limit
Revit files, IFC exports, Navisworks federated models, and coordination ZIPs on large projects routinely outgrow email and stall in browser uploaders.
Built for controlled delivery of RVT, IFC, NWD, coordination packages, bid sets, owner handoff packages, and scan-to-BIM datasets — on a plan that starts at 10 TB.
VDC and BIM teams exchange model and documentation packages that exceed email and SaaS limits — on immovable calendar deadlines. Plans start at 10 TB for teams that treat delivery as operations.
Revit files, IFC exports, Navisworks federated models, and coordination ZIPs on large projects routinely outgrow email and stall in browser uploaders.
Version confusion creates RFI churn. Teams need a controlled delivery path with history — not ad-hoc links in personal cloud accounts.
Owners and subs need access during bid or meeting windows — then access should expire. Generic sharing tools don't enforce that cleanly.
Regional offices and jobsite connections need desktop-scale throughput for large packages with progress and retry — not uploads that stall before Monday's site walk.
Random Dropbox and WeTransfer links bypass IT policy. Teams need organization-backed delivery with recipient controls and audit-friendly status.
TeraAirlift gives BIM coordinators and VDC teams a professional desktop console for queuing large model packages, setting recipient policy, and monitoring uploads with the visibility coordination milestones demand.
From coordination session to verified model delivery — built for calendar-driven milestones.
Microsoft Entra ID authentication for enterprise-backed access. No personal cloud accounts required for controlled delivery.
Add IFC/NWD exports, clash reports, BCF packages, or site photo sets via file picker or drag-and-drop. Queue multiple packages for Friday-night delivery.
Set GC, architect, and trade partner emails. Align link expiration with bid deadlines or coordination meeting dates.
Start uploads from your office connection. Monitor active jobs, throughput, ETA, and delivery status from the operations console.
Trade partners and owners download available packages with progress tracking. No hunting through email threads for expired links.
SHA-256 verification confirms the package arrived intact — reducing disputes about corrupted or incomplete model sets.
Concrete delivery scenarios for construction and BIM teams.
Send coordination exports after clash detection sessions — recipient-locked with expiration aligned to the site walk.
Distribute large bid packages to subs with time-boxed access that expires after the bid window closes.
Deliver large documentation sets from the jobsite without choking browser uploaders on trailer Wi-Fi.
Transfer large point-cloud and model packages to design partners with integrity verification on delivery.
Line up multiple coordination packages overnight — check queue status before the morning standup.

Coordination packages should land before the meeting starts.
Recipient controls, expiring access, and integrity verification — without claiming certifications we can't verify.
Set who can download, when links expire, and whether access is recipient-only — enforced server-side, not on the honor system.
Files are hashed before upload, validated on completion, and verified again on download — so corrupted deliverables are caught before they reach your client.
Presigned URLs and SAS tokens expire quickly. Blob credentials never persist on the desktop client.
Sign in with Microsoft Entra ID for organization-backed access. Built for B2B teams, not casual link sharing.
Queue metrics, per-transfer detail, delivery status, error logging, and diagnostics export — the visibility generic file-sharing tools don't provide.
Upload and download traffic goes directly to cloud storage — not proxied through the API — for higher throughput and predictable performance.
Run a planning estimate for your package size and bandwidth before you commit tonight's deadline.
Calculate Transfer TimeSee recipient access windows, package verification, and coordination timing with your VDC team.
Schedule a DemoTell us about your file transfer workflow and we’ll follow up to schedule a product demo tailored to your team.